. 24/7 Space News .
SMART-1 Maneuvers Prepare For Mission End

Image credit: ESA
by Staff Writers
Darmstadt, Germany (SPX) Jun 26, 2006
After 16 months orbiting the Moon, ESA's lunar mission is preparing for the end of its scientific exploration. Last Monday, SMART-1 mission controllers initiated a 17-day series of maneuvers aimed at positioning the spacecraft to enhance science data return as the mission winds down.

SMART-1, Europe's successful first Moon mission, is scheduled to end on Sept. 3, impacting on the lunar surface in a disposal plan similar to that of many earlier missions and almost three years to the day after its 2003 launch.

With the maneuvers, ESA controllers aim to avoid having the spacecraft impact on the Moon at a disadvantageous time - from a scientific point of view - which would have happened on or about Aug. 17 if the spacecraft had been allowed to continue on its present trajectory.

Instead, the extension of the mission will provide new opportunities for low-altitude scientific observations and optimum science returns during and after the spacecraft's controlled impact.

In preparation for mission end, controllers at ESA's Spacecraft Operations Center have started a series of thruster firings to give a delta velocity, or change in velocity, of approximately 12 meters (39 feet) per second.

This action will raise the orbit perilune (point of closest passage over the Moon) by about 90 kilometers (56 miles) and will shift the impact date to Sept. 3.

"The shift in date, time and location for Moon intersection is also optimized to favor scientific observations from Earth," said Gerhard Schwehm, ESA's SMART-1 mission manager.

"Projections based on the current orbit indicated that the spacecraft, if left as is, would impact the Moon on the far side, away from ground contact and visibility. The new location is on the Moon's near-side, at mid-southern latitudes," he added.

For the maneuver campaign, the use of the electric propulsion system (the ion engine) had to be ruled out since all Xenon propellant reserves were exhausted during the mission. The mission control team instead has developed an imaginative approach.

"The maneuver strategy consists of a series of reaction-wheel off-loadings combined with about three hours of intermittent thrust centered at apolune (point of furthest distance from the Moon) during the next 74 orbits," said Octavio Camino, Spacecraft Operations Manager at ESOC.

The off-loading consists of braking a set of spinning wheels inside the spacecraft, which has the effect of transferring angular momentum from the wheels to the spacecraft and hence changing its velocity.

"We use asymmetric firing of the attitude thrusters to produce a small velocity variation aligned with the flight direction. This will change the orbit by an accumulative effect," Camino said.

"After these maneuvers, science activities will resume until the impact, with short interruptions for two trim maneuvers to adjust the impact time, one around the end of July and one at the beginning of September," he added.

Related Links
SMART-1



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


GMV To Provide Mission Planning Software For Lunar Reconnaissance Orbiter
Rockville, MD (SPX) Jun 19, 2006
GMV Space Systems Inc., a satellite ground segment software company, announced Sunday that its FlexPlan software has been selected to provide the mission planning and scheduling system for NASA's Lunar Reconnaissance Orbiter spacecraft.







  • Botanist To Study Seed Behavior Aboard Space Station
  • Douglass Urges NASA And Industry To Address Workforce Crisis
  • Optimize Trade Study Analyses With Software From Phoenix Integration And AGI
  • Stephen Hawking Calls For Mankind To Reach For Stars

  • Spirit Turns On Heaters To Continue Working
  • Three Sols Of Driving Gain Opportunity 138 Meters
  • Other NASA Martian Landers Turning 30
  • Spirit Continues Work As Martian Winter Deepens

  • Alcatel Alenia Space To Provide Communication Payload For Arabsat BADR-6 Satellite
  • Alcatel Alenia Space To Provide Onboard Equipment For Soyuz-Fregat Launchers
  • Boeing Delta II Delivers Military Technology Demonstration Mission
  • Ariane 5 Receives Improved Upper Stage

  • Canada To Fund More Access To Latest Satellite Imaging Data
  • GlobeXplorer Adds 200th City To CitySphere International Datebase
  • Medspiration Charts All Med Water Temperatures
  • GeoEye Awarded Airport Mapping Database Contract

  • IAU Approves Names For Two Small Plutonian Moons
  • Three Trojan Asteroids Share Neptune Orbit
  • New Horizons Crosses The Asteroid Belt
  • Trio Of Neptunes And Their Belt

  • Integral Sees A GRB Out Of The Corner Of Its Eye
  • Desert Cosmic Ray Detector Project Moving Ahead
  • How To Bake A Galaxy
  • Hubble Sees Star Birth Gone Wild

  • SMART-1 Maneuvers Prepare For Mission End
  • GMV To Provide Mission Planning Software For Lunar Reconnaissance Orbiter
  • NASA Spies Lunar Meteoroid Impact
  • Shanghai Lands Star Role In Satellite Mission

  • Baltimore City Public School Buses and Pupils Made Safer With GPS System
  • UN To Hold Workshop On Navsat Applications In Sub-Saharan Africa
  • Luxembourg Companies To Build Galileo Antenna System
  • Raytheon's Enhanced Paveway II Remains Right on Target in Danish Tests

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement