Subscribe free to our newsletters via your
. 24/7 Space News .




TECH SPACE
USMC Conducts Operational Assessment of GATOR System
by Staff Writers
Baltimore MD (SPX) Dec 05, 2013


File image.

The AN/TPS-80 Ground/Air Task Oriented Radar (G/ATOR) system, built by Northrop Grumman for the U.S. Marine Corps, has successfully conducted developmental testing and supported two Weapons and Tactics Instruction (WTI) events at Marine Air Control Squadron (MACS) Yuma over the past 10 months. These events supported the operational assessment of the G/ATOR system for Milestone C.

During the assessment, Northrop Grumman's AN/TPS-80 provided excellent situational awareness by successfully detecting, tracking and identifying a wide range of aerial targets. The radar also demonstrated its ability to extract targets from heavy clutter backgrounds. The radar also exceeded its objective-level operational availability requirement.

"Under very intense testing conditions, our AN/TPS-80 detected and tracked targets that other systems at the exercise were not able to," said Jeffrey Q. Palombo, Vice President and General Manager of Northrop Grumman's Land and Self Protection Systems Division.

"We look forward to continuing our strong partnership and collaboration with the Marine Corps on this program as it proceeds to Milestone C."

The AN/TPS-80 is the first ground-based, multimission radar to be developed for the Department of Defense. Designed to detect and track a wide variety of threats, the radar is built with an open, scalable architecture to enable digital interoperability and incorporation of new capabilities through software-only updates.

Earlier this year, Northrop Grumman's AN/TPS-80 Engineering Development Model (EDM) system demonstrated its ballistic missile defense capability by successfully detecting multiple rocket launches during company-funded testing at Wallops Island, Va.

The Government AN/TPS-80 EDM system then completed two phases of government developmental testing at the Surface Combat Systems Center (SCSC) at Wallops Island before undergoing more rigorous developmental testing at MACS Yuma.

Completion of the developmental testing and assessment, along with the successful conduct of the production readiness review in September, positions the USMC for a Milestone C decision to authorize low-rate initial production.

.


Related Links
Northrop Grumman
Space Technology News - Applications and Research






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle








TECH SPACE
Northrop Grumman Wins Enterprise Air Surveillance Radar Study
Baltimore MD (SPX) Nov 14, 2013
Northrop Grumman has been selected by the U.S. Navy to conduct a study that explores the replacement of the SPS-48 and SPS-49 air surveillance radars currently on board U.S. Navy amphibious ships and aircraft carriers. The $6 million, 18-month Enterprise Air Surveillance Radar (EASR) Study, sponsored by the Office of Naval Research under its Integrated Topside program, will examine how an ... read more


TECH SPACE
China launches first moon rover mission

Japanese firm describes proposed 'power belt' for the moon

Helping China To The Moon

Spotlight on China's Moon Rover

TECH SPACE
ExoMars program marks critical milestone for ESA and Russia

Deep Space Perils For Indian Spacecraft

Curiosity Resumes Science After Analysis of Voltage Issue

Winter Means Less Power for Solar Panels

TECH SPACE
NASA Taps Student Teams to Simulate Human Exploration of Other Worlds

Moon gardens: NASA to sow first seeds of future habitat

Asian giants China, India dominate space program news

India's spacecraft successfully begins journey to Mars

TECH SPACE
China space launch debris wrecks villagers' homes: report

Designer: moon rover uses cutting-edge technology

Commentary: Lunar probe boosts "Chinese dream"

China to launch moon rover on Monday

TECH SPACE
Russian android may take on outer space operations at ISS

Repurposing ISS Trash for Power and Water

Russian spacecraft with advanced navigation system docks with ISS

Space freighter docks at International Space Station

TECH SPACE
SpaceX postpones first satellite launch

Second rocket launch site depends on satellite size, cost-benefit

Private US launch of satellite delayed

Stepping up Vega launcher production

TECH SPACE
The State of Super Earths

Search for habitable planets should be more conservative

NASA Kepler Results Usher in a New Era of Astronomy

Astronomers answer key question: How common are habitable planets?

TECH SPACE
Mission possible: Simulation-based training and experimentation on display

Uncovering hidden structures in massive data collections

Telescope to track space junk using youth radio station

USMC Conducts Operational Assessment of GATOR System




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement